Number: 18393396
Country: Bosnia and Herzegovina
Source: TED
Manning of the Jet Fuel Distribution Point at HQ EUFOR Camp Butmir
The contractor shall furnish all labor, materials, parts, equipment and transportation, as necessary, to perform manning of jet fuel distribution point at HQ EUFOR Camp Butmir in accordance with the terms of reference (Annex II).
1.2) The contractor shall comply strictly with the terms of the contract and special conditions and its Annexes;
1.3) The place of performance shall be Archer Base fuel station at Butmir Camp, 71210 Ilidza, Bosnia and Herzegovina. The time limits for the service shall be in accordance with the TOR in Annex II. The performance period shall run from 1.1.2020 to 31.12.2020, with the possibility to be extended on yearly basis until maximum 31.12.2021.
Manning of Jet Fuel Distribution Point at HQ EUFOR Camp Butmir